Home Products & Services Civil Engineering Bridge Asean Bridge, Miri
side_img_bridge The official opening ceremony of Asean Bridge (formerly known as Batang Baram Bridge) was held on 30th August, 2003 by THE RIGHT HONOURABLE DATUK PATINGGI TAN SRI DR. HAJI ABDUL TAIB MAHMUD. The photos of the Asean Bridge opening ceremony can be viewed HERE. We also appreciate for the MESSAGE from THE RIGHT HONOURABLE DATUK PATINGGI TAN SRI DR. HAJI ABDUL TAIB MAHMUD.

 


Project Location


The Asean Bridge is located approximately 2km upstream of the New Miri Port Complex. The bridge and access road directly link Sarawak with Brunei across the Batang Baram via the existing Immigration Checkpoint at Sungai Tujuh.


Project Background

Construction of the Asean Bridge and access road commenced on 17th January 2001 and scheduled for completion in a contract period of 42 months on 16th July 2004. With a team of dedicated engineers, contruction personnel, contractors and assisted by all relevant helpful government authorities, especially Jabatan Kerja Raya, the whole project was completed in August 2003.



Technical Design Data


The Project - A total length of 7.769km complete with access road and 2 lanes dual carriage way Balanced Cantilever Concrete Bridge.

Bridge Design - The bridge is designed in accordance with the latest British Standard BS 5400. The bridge has 19 spans with a total of 1040 meters.

 

aseanbridgetop

Main Span

* A total length of 400 meters comprising a 180 meters main soan and 110 meters anchor span on either side constructed using Balanced Cantilever Construction Method.
* A navigation Clearance of 20 meters (height) by 100 meters (width). The highest bridge deck level is 28.0 meters above Mean Water level.
* Each Carriage Way is 8.0 meters wide (2 lanes) together with a 1.5 meter width concrete footpath separated by a central New Jersey concrete Barrier.



Approach Span

* A total length of 640 meters comprising 16 spans of 10 numbers 40-meter length Precast Concrete T-Beams.

* Each Carriage Way is 8.0 meters wide (2 lanes) together with a 1.5 meter width concrete footpath separated by a central New Jersey concrete Barrier.


Access Road

* A total length of 6.729km comprising a toll plaza with office and a round about joining the existing road to Sungai Tujuh Immigration Checkpoint.
* The road width is 7.5 meters with hard shoulder on each side.

 

 